New Addition the ramp is being prepared to be poured, the frames for the glass at the media center are being installed.
The new sidewalk at the west entrance near the Administration parking lot.
The trays for the vegetative (green) roof are being installed.
The base frame and side rails are the first part of the elevator installation.
Middle school classrooms with the new cabinets and the overlapping white boards.
No comments:
Post a Comment
Please feel free to comment, selecting anonymous under the “comment as” drop down menu allows you to comment without having to sign in.