The new sign on the south entrance, it is pre-cast concrete.
The sign came in three large pieces.
The sign came in three large pieces.
To provide air conditioning to the new school building chilled water is
piped from the chiller plant north of the steam plant. These pipes are six inches
in diameter and will be buried about 4 feet underground.
The south entrance of the Gottlieb School:
new stairs leading the door (left), ramp up to the door (center and right).
new stairs leading the door (left), ramp up to the door (center and right).
Student Lockers in high school commons area.
Glass wall on east of media center leading out to patio.
No comments:
Post a Comment
Please feel free to comment, selecting anonymous under the “comment as” drop down menu allows you to comment without having to sign in.