Sunday, July 10, 2011

DSCN5916DSCN5913DSCN5917DSCN5911
Clockwise from upper left:
Structural platform for the energy recovery unit on the roof,  New roof over lobby and media center, View from roof near science lab,  North side of science lab roof.

Below:
Cabinets and teaching walls in high school classrooms.
DSCN6000DSCN5932
DSCN5934DSCN5998

High school commons and teachers work space
DSCN5986DSCN5987DSCN5988DSCN5994

DSCN6019

Special corner treatment for entrance into Middle school commons.  Repurposed glazed tile from hallways of pre-renovated Gottlieb.











Large and very heavy plates of steel that will wrap the 20” door jambs created by cutting through the old building.  The door shown is from the lobby to the stage door.
DSCN6054DSCN6055

Thursday, July 7, 2011

DSCN5900DSCN5901
New driveway from the Administration Building parking lot.

DSCN5873DSCN5874DSCN5875DSCN5876
Exterior photos:  (Clockwise) New addition from south east, New addition from the south, New addition from the south west, West face of building with new windows.

Thursday, June 30, 2011

The project is moving very quickly at this point. 
DSCN5788





The new windows are almost complete on the top floor.




DSCN5731




The skylights on top floor are nearly complete.DSCN5738




The Science room is framed and the roof decking is installed.










DSCN5734DSCN5735DSCN5732
Photos of the high school hallway, commons area, and new windows.

DSCN5759




Close up of tile on restroom walls on main floor.

Wednesday, June 8, 2011

DSC_0015DSC_0061
Two of seven original windows that will remain in the building.  These will all face into the new addition.  They will become display cases when the work is completed.
DSC_0022

The exterior framing is being installed on the new addition.    The lower part will be offices and the upper part is the railing for the green roof.





DSC_0030DSC_0035DSC_0031
Drywall installation is almost complete on the top floor ,  taping and finish work has started.

DSC_0066


One of several walls that are filled with the piping that will contain wires for new systems and technology for the building.

Sunday, June 5, 2011

DSC_0138

 

 

The structural steel for the roof of the new addition is almost complete.  The area on the left is the ceiling of the new science lab.  The roof on the right is the ceiling of the media center and the patio cover outside the media center.DSC_0149

 

 

 

The roof line for the addition from the north looking south.DSC_0144

 

A teaching wall, the recessed area will house the interactive system for instruction. The silver box on the left is for the classroom control touch panel. DSC_0155

 

 

The steel for the new stairs from the main level of the media center to the lower level of the media center.

Tuesday, May 3, 2011

DSC_0001

The erecting of structural steel started this week in the new addition. A crane was set up on campus to move the steel in place and this crane is a self erecting crane. A self erecting crane comes on a trailer and has a base that does not move once it is set up.  The grey weights are the counter balance that prevent the crane from tipping.  A typical crane has a seat and controls for the operator,  this crane is operated by a hand held remote.  This allows the operator to get close to the work. DSC_0008DSC_0009DSC_0062DSC_0078

DSC_0076

DSC_0080

 

This is the new entrance from the addition to the lower level and the elementary area. This concrete was cut with a large diamond blade saw and is being removed with jack hammers.

Sunday, May 1, 2011

DSC_0077DSC_0078

DSC_0079

 

 

These three photos show the excavation work for the new ramp on the south side of the building. The ramp will enter in the building in the elementary area.

 

 

 

Framing in the lower level

DSC_0025

 

Windows in the elementary staff work space look out towards the elementary commons area.

 

 

 

DSC_0118DSC_0115

    Elementary classroom

 

 

 

Rest room in the elementary level.