The demolition work is almost complete, framing work is being done on the top and main floor. The utilities work is moving along, the sanitary sewer and the water line is complete. The fire line, the storm sewer and the electrical have all been started.
As part of the demolition a very unique treasure was uncovered, in 1996 the kitchen on the lower level was installed. During the installation a CSDB staff member drew some caricatures of a few of our staff. These were drawn on the wall behind the kitchen cabinets.