The demolition is underway on the main floor.
If you were ever curious what the glazed tile in
the hallways looked like inside and from the back.
The asbestos abatement is completed on the inside of the building. The outside work consists of removing the perimeter caulking from the windows. This scissor lift is used to get to the upper windows.
No comments:
Post a Comment
Please feel free to comment, selecting anonymous under the “comment as” drop down menu allows you to comment without having to sign in.