The demolition is underway on the main floor.

DSC_0108DSC_0109DSC_0110DSC_0100

If you were ever curious what the glazed tile in
the hallways looked like inside and from the back.

DSC_0101DSC_0104

 

DSC_0115

 

  

 

The asbestos abatement is completed on the inside of the   building.  The outside work consists of removing the perimeter caulking from the windows.  This scissor lift is used to get to the upper windows. 