Tuesday, May 3, 2011

DSC_0001

The erecting of structural steel started this week in the new addition. A crane was set up on campus to move the steel in place and this crane is a self erecting crane. A self erecting crane comes on a trailer and has a base that does not move once it is set up.  The grey weights are the counter balance that prevent the crane from tipping.  A typical crane has a seat and controls for the operator,  this crane is operated by a hand held remote.  This allows the operator to get close to the work. DSC_0008DSC_0009DSC_0062DSC_0078

DSC_0076

DSC_0080

 

This is the new entrance from the addition to the lower level and the elementary area. This concrete was cut with a large diamond blade saw and is being removed with jack hammers.

Sunday, May 1, 2011

DSC_0077DSC_0078

DSC_0079

 

 

These three photos show the excavation work for the new ramp on the south side of the building. The ramp will enter in the building in the elementary area.

 

 

 

Framing in the lower level

DSC_0025

 

Windows in the elementary staff work space look out towards the elementary commons area.

 

 

 

DSC_0118DSC_0115

    Elementary classroom

 

 

 

Rest room in the elementary level.