Monday, April 18, 2011

Concrete was placed inside the building and in the walls for the addition.
Two different pumps were used.

DSC_0062DSC_0063

The trailer pump has a bin that the concrete is dumped in from the truck. The concrete is pumped through a hose to where it is needed.

DSC_0072 DSC_0070

DSC_0081

Finished product, the floor where the south stairwell was.

 

 

 

 

 

 

 

DSC_0092DSC_0093
A truck style pump works in the same manner.  The truck concrete pump has a boom that allows the operator to place concrete in a specific place. In this case the new walls for the addition.

DSC_0094DSC_0098