Tuesday, May 3, 2011

DSC_0001

The erecting of structural steel started this week in the new addition. A crane was set up on campus to move the steel in place and this crane is a self erecting crane. A self erecting crane comes on a trailer and has a base that does not move once it is set up.  The grey weights are the counter balance that prevent the crane from tipping.  A typical crane has a seat and controls for the operator,  this crane is operated by a hand held remote.  This allows the operator to get close to the work. DSC_0008DSC_0009DSC_0062DSC_0078

DSC_0076

DSC_0080

 

This is the new entrance from the addition to the lower level and the elementary area. This concrete was cut with a large diamond blade saw and is being removed with jack hammers.