Sunday, August 7, 2011

DSCN6331DSCN6332
The new sign on the south entrance,  it is pre-cast concrete. 
The sign came in three large pieces.

DSCN6319DSCN6328DSCN6320
To provide air conditioning to the new school building chilled water is
piped from the chiller plant north of the steam plant.  These pipes are six inches
in diameter  and will be buried about 4 feet underground.   
DSCN6365DSCN6366DSCN6367
The south entrance of the Gottlieb School:
new stairs leading the door (left), ramp up to the door (center and right).
DSCN6385DSCN6383DSCN6382
Auditorium ceiling
DSCN6402




   Student Lockers in high school commons area.




DSCN6424

Glass wall on east of media center leading out to patio.
DSCN6423


DSCN6414DSCN6413DSCN6412
Corridor walls have a wainscoting with a maple chair rail.  

No comments: