Sunday, June 5, 2011

DSC_0138

 

 

The structural steel for the roof of the new addition is almost complete.  The area on the left is the ceiling of the new science lab.  The roof on the right is the ceiling of the media center and the patio cover outside the media center.DSC_0149

 

 

 

The roof line for the addition from the north looking south.DSC_0144

 

A teaching wall, the recessed area will house the interactive system for instruction. The silver box on the left is for the classroom control touch panel. DSC_0155

 

 

The steel for the new stairs from the main level of the media center to the lower level of the media center.

No comments:

Post a Comment

Please feel free to comment, selecting anonymous under the “comment as” drop down menu allows you to comment without having to sign in.