Tuesday, July 12, 2011

The Energy recovery Unit was delivered this evening.  This very large unit sits on the roof as part of the heating and cooling system. 
DSCN6107DSCN6108
  The crane used to set the unit on the roof.         The counter balance weights for the crane.

Before the crane can pick up the load the crane moves it’s own counter balance weights and they are connected at the back of the crane.
DSCN6112DSCN6116


DSCN6118DSCN6119
The unit arrives on campus
then
soars through the air
DSCN6120DSCN6123DSCN6124DSCN6125

DSCN6128DSCN6129DSCN6130DSCN6137
and it lands in place.

No comments:

Post a Comment

Please feel free to comment, selecting anonymous under the “comment as” drop down menu allows you to comment without having to sign in.