Thursday, June 30, 2011

The project is moving very quickly at this point. 
DSCN5788





The new windows are almost complete on the top floor.




DSCN5731




The skylights on top floor are nearly complete.DSCN5738




The Science room is framed and the roof decking is installed.










DSCN5734DSCN5735DSCN5732
Photos of the high school hallway, commons area, and new windows.

DSCN5759




Close up of tile on restroom walls on main floor.

Wednesday, June 8, 2011

DSC_0015DSC_0061
Two of seven original windows that will remain in the building.  These will all face into the new addition.  They will become display cases when the work is completed.
DSC_0022

The exterior framing is being installed on the new addition.    The lower part will be offices and the upper part is the railing for the green roof.





DSC_0030DSC_0035DSC_0031
Drywall installation is almost complete on the top floor ,  taping and finish work has started.

DSC_0066


One of several walls that are filled with the piping that will contain wires for new systems and technology for the building.

Sunday, June 5, 2011

DSC_0138

 

 

The structural steel for the roof of the new addition is almost complete.  The area on the left is the ceiling of the new science lab.  The roof on the right is the ceiling of the media center and the patio cover outside the media center.DSC_0149

 

 

 

The roof line for the addition from the north looking south.DSC_0144

 

A teaching wall, the recessed area will house the interactive system for instruction. The silver box on the left is for the classroom control touch panel. DSC_0155

 

 

The steel for the new stairs from the main level of the media center to the lower level of the media center.

Tuesday, May 3, 2011

DSC_0001

The erecting of structural steel started this week in the new addition. A crane was set up on campus to move the steel in place and this crane is a self erecting crane. A self erecting crane comes on a trailer and has a base that does not move once it is set up.  The grey weights are the counter balance that prevent the crane from tipping.  A typical crane has a seat and controls for the operator,  this crane is operated by a hand held remote.  This allows the operator to get close to the work. DSC_0008DSC_0009DSC_0062DSC_0078

DSC_0076

DSC_0080

 

This is the new entrance from the addition to the lower level and the elementary area. This concrete was cut with a large diamond blade saw and is being removed with jack hammers.

Sunday, May 1, 2011

DSC_0077DSC_0078

DSC_0079

 

 

These three photos show the excavation work for the new ramp on the south side of the building. The ramp will enter in the building in the elementary area.

 

 

 

Framing in the lower level

DSC_0025

 

Windows in the elementary staff work space look out towards the elementary commons area.

 

 

 

DSC_0118DSC_0115

    Elementary classroom

 

 

 

Rest room in the elementary level.

Sunday, April 24, 2011

The top floor will have tubular skylights, there will be approximately three skylights per room.  The amount of natural light entering through each skylight will be controlled by the touch panel in each classroom.

DSC_0076

 

 

These are two of the openings in the roof from one of the classrooms.  The tubes that come through the roof will allow light to shine into the room through a plastic lens in the ceiling.

 

 

DSC_0070

 

 

The opening from the roof side of the skylights. This is the first step in the process, an opening was cut though the roof to the concrete deck.  A large core drill was used to make a 14” round hole through the concrete deck.DSC_0074

 

 

This photo shows all the skylight openings on the roof.DSC_0073

 

This is the completed framing and the finished roof surface.  The next step is to wrap the plywood with a material to complete the process of making the opening water tight.

The skylight will sit on top of this wooden curb.

 

 

DSC_0001

 

 

The work on the new addition  is continuing.  The elevator shaft is complete.  The walls have been poured for the lower level.  The two openings in the wall are the windows for the media center office.  Installation of structural steel is the next step.

Monday, April 18, 2011

Concrete was placed inside the building and in the walls for the addition.
Two different pumps were used.

DSC_0062DSC_0063

The trailer pump has a bin that the concrete is dumped in from the truck. The concrete is pumped through a hose to where it is needed.

DSC_0072 DSC_0070

DSC_0081

Finished product, the floor where the south stairwell was.

 

 

 

 

 

 

 

DSC_0092DSC_0093
A truck style pump works in the same manner.  The truck concrete pump has a boom that allows the operator to place concrete in a specific place. In this case the new walls for the addition.

DSC_0094DSC_0098